Permitted development rights allow certain types of building work without a full planning application, as long as specific limits and conditions are met. For solar on homes in England, the rules sit in Part 14 of the Town and Country Planning (General Permitted Development) (England) Order 2015, which was amended by a new order that came into force on 27 August 2026.
Under these rules, solar panels and solar thermal equipment on a house are generally permitted development if they stay within the size and position limits and the property is not excluded, for example because it is listed.
Permitted development also comes with general conditions. Equipment should, so far as practicable, be sited to minimise its effect on the appearance of the building and the amenity of the area, and it should be removed as soon as reasonably practicable when no longer needed.
Permitted development rights can be removed or restricted in some places, for example by an Article 4 Direction in a conservation area or by conditions on the original planning permission for a newer home. If you are unsure, check with your local planning authority before committing to an installation.